help desk software

Search results for "jumpers shunts"

筛选结果
295 PRODUCTS

CA801/A3

Altech

Conn Push In Jumper M 3 POS ST

  • MANUFACTURER STOCK 120
    Ships 12/1/25

  • 50
    $3.06
  • 100
    $2.97
  • 250
    $2.84
see all

CA625/2

Altech

Conn Internal Jumper M 2 POS Screw ST

  • MANUFACTURER STOCK 100
    Ships 12/1/25

  • 100
    $0.919
  • 300
    $0.891
  • 500
    $0.851
see all

2P18U3S/56

Altech

Altech 2P18U3S/56 Busbar, 2 Phase, 18mm2/80A, 56 Lugs, UL1077/508 Series

  • Lead Time: 6 WEEKS

  • 1
    $97.11
  • 5
    $89.87
  • 10
    $87.26
see all

1P18U1H/31

Altech

Altech 1P18U1H/31 Busbar, 1 Phase, 18mm2/80A, PIN, 31 Lugs, UL1077/508 Series

  • Lead Time: 6 WEEKS

  • 1
    $39.36
  • 5
    $35.12
  • 10
    $34.60
see all

2P18U3S/38

Altech

Altech 2P18U3S/38 Busbar, 2 Phase, 18mm2/80A, 38 Lugs, UL1077/508 Series

  • Lead Time: 6 WEEKS

  • 1
    $76.88
  • 5
    $68.60
  • 10
    $66.55
see all

2P18U3/28

Altech

Busbar, 2-Phase, Std. Spacing, 18 mm for 80A, 28 Pins, 492.3 mm, UL508 | Altech Corp 2P18U3/28

  • Lead Time: 6 WEEKS

  • 1
    $49.31
  • 5
    $44.00
  • 10
    $42.69
see all

2P25U3/44

Altech

Busbar, 2-Phase, Std. Spacing, 25 mm for 100A, 44 Pins, 776.3 mm, UL508 | Altech Corp 2P25U3/44

  • Lead Time: 6 WEEKS

  • 1
    $78.12
  • 5
    $69.71
  • 10
    $67.63
see all

2P18U3S/34

Altech

Altech 2P18U3S/34 Busbar, 2 Phase, 18mm2/80A, 34 Lugs, UL1077/508 Series

  • Lead Time: 6 WEEKS

  • 1
    $70.91
  • 5
    $63.28
  • 10
    $61.39
see all

3P18U3/45

Altech

Busbar, 3-Phase, Std. Spacing, 18 mm for 80A, 45 Pins, 794 mm, UL508 | Altech Corp 3P18U3/45

  • Lead Time: 6 WEEKS

  • 1
    $84.11
  • 5
    $77.84
  • 10
    $75.58
see all

2P25U3/48

Altech

Busbar, 2-Phase, Std. Spacing, 25 mm for 100A, 48 Pins, 847.3 mm, UL508 | Altech Corp 2P25U3/48

  • Lead Time: 6 WEEKS

  • 1
    $83.64
  • 5
    $74.63
  • 10
    $72.40
see all