4,363 Products

ATV12HU15M2

Schneider Electric

The ATV12HU15M2 is a 1.5 kW (2 hp) variable speed drive designed for 200-240V single-phase power supplies.

  • In Stock: 2
    Immediately

  • 1
    $354.06
  • 3
    $344.43
  • 5 +
    $339.93
see all

ATV320U04N4C

Schneider Electric

The ATV320U04N4C is a compact, 3-phase variable speed drive designed for 0.37 kW motors with a supply voltage ran ...

  • In Stock: 2
    Immediately

  • 1
    $396.28
  • 3
    $385.52
  • 5 +
    $380.52
see all

ATV320U22M2C

Schneider Electric

The ATV320U22M2C is a compact, single-phase variable speed drive for 2.2 kW motors, operating on a 200-240V suppl ...

  • In Stock: 2
    Immediately

  • 1
    $526.17
  • 3
    $511.72
  • 5 +
    $504.96
see all

R88DKN10HECT

Omron Automation

Servomotor/Drive Single-Phase/Three-Phase 200 Vac

  • Lead Time: 3 Weeks

  • 1
    $2,775.01
  • 3
    $2,630.85
  • 5 +
    $2,597.13
see all

R88DKN02LECT

Omron Automation

Servo Drives With 100 VAC Input Power For Single-Phase Input Type

  • Lead Time: 5 Weeks

  • 1
    $2,007.12
  • 3
    $1,953.60
  • 5 +
    $1,902.86
see all

R88DKT01H

Omron Automation

AC Servo Drives With General-Purpose Pulse Train Or Analog Inputs

  • Lead Time: 3 Weeks

  • 1
    $1,811.83
  • 3
    $1,763.52
  • 5 +
    $1,717.71
see all

ATV320U11N4WS

Schneider Electric

variable speed drive, Altivar Machine ATV320, 1.1kW, 380 to 500V, 3 phases, enclosed, IP65

  • Lead Time: 2 Weeks

  • 1
    $856.76
  • 3
    $845.03
  • 5 +
    $822.49
see all

ATV212HD18N4

Schneider Electric

variable speed drive, Altivar 212, 18.5kW, 25hp, 480V, 3 phases, with EMC, IP21

  • Lead Time: 2 Weeks

  • 1
    $2,664.72
  • 3
    $2,526.30
  • 5 +
    $2,519.98
see all

ATV320U40N4WS

Schneider Electric

variable speed drive, Altivar Machine ATV320, 4kW, 380 to 500V, 3 phases, enclosed, IP65

  • Lead Time: 2 Weeks

  • 1
    $1,379.53
  • 3
    $1,342.74
  • 5 +
    $1,307.87
see all

VW3M5501R500

Schneider Electric

power cordset 4x1,5mm² + 2x1mm² + 2x0,14mm² 50 m one end w M23 industrial con.

  • Lead Time: 15 Weeks

  • 1
    $4,022.56
  • 3
    $3,918.09
  • 5 +
    $3,867.86
see all

Join the circuit, keeping you connected to OnlineComponents.com and beyond!